INSTALLATION INSTRUCTIONS
CPV-T2-PXC
Thermostatic Shower Valve
CPV-T2-DV-PXC
Thermostatic Shower Valve
with Integral Diverter
92-CPV-T2-PXC-01
NEED HELP?
For additional assistance or service please contact:
ROUGH IN VERTICAL REFERENCE
TUB/SHOWER
78"
(1981mm)
21"
(533mm)
4"
(102mm)
TO TOP OF
TUB LEDGE
TOOLS & SUPPLIES NEEDED
Pencil
Measuring
Level
Mounting
Tape
Hardware
(not included)
Drill
Phillips
Flat Tip
Drive Bit
Screwdriver
Screwdriver
Socket
9/16" (14mm)
Slip Joint
Pipe
Wrench
Wrench
Wrench
Deep Well Socket
Solder Kit
Thread Seal
Tubing
Tape
Protection
Cutter
Crimp
PEX
PEX Crimp
Ring
Go/No-Go
Tool
Cutter
Gauge
www.speakman.com
800-537-2107
SHOWER ONLY
78"
(1981mm)
48"
(1219mm)
IMPORTANT
SAFETY TIPS:
Be sure to read and understand all instructions
before beginning installation.
Inspect all connections after installation.
Cover the drain to avoid loss of parts.
Be sure to wear proper eye protection.
Phillips
Do NOT over tighten any connections or damage
may occur.
Shut OFF water supplies before beginning
installation.
Observe all local plumbing and building codes.
VALVE SPECIFICATIONS:
This Valve has an operating range of 20-80 psi.
This Valve is engineered to be used in conjunction
with a Shower Head rated at 1.35 gpm (5.1 L/min)
or higher flow rate.
Maximum water pressure: 125 psi static.
Eye
Minimum water pressure: 20 psi flowing.
Minimum Cold Supply Temperature: 40°F.
Maximum Hot Supply Temperature: 160°F.
Minimum Hot Supply Temperature: 5°F above set
point.
PEX
Determine the mounting depth of the Valve referencing the diagrams below. The Protective Cover on the
Valve has reference markings showing where the Valve should align with the Finished Wall Surface. The
distance from the Finished Wall Surface to the centerline of the Valve Outlets MUST fall between 2-1/2"
Minimum and 3-1/2" Maximum.
2-½"
64mm
MINIMUM
FINISHED
WALL
SURFACE
Risk of personal injury. Do NOT use the Valve
without properly adjusting the Temperature Limit
Stop (TLS) as outlined in this installation
manual.
Ensure proper structure is in place to support
the Valve and plumbing during use.
Your new product is designed for years of
trouble-free performance.
This type of valve must be cleaned and
maintained on a regular basis. Periodic
maintenance should be performed at least
every 12 months or after any changes have
been made to the building's plumbing system.
Valves that are installed outdoors should be
winterized by removing all of the internal parts
and removing any standing water from the
valve. Quarterly the maximum hot temperature
setting (TLS) should be checked and adjusted
accordingly.
FINISH MAINTENANCE:
Keep the surface finish looking new by cleaning
it periodically with a soft cloth. Avoid abrasive
cleaners, steel wool, and harsh chemicals as
these will dull the finish and void your warranty.
ROUGH IN DEPTH REFERENCE
4-½"
114mm
FINISHED
3-3/16"
WALL
81mm
MINIMUM
SURFACE
CAUTION
MAINTENANCE
ALIGNS WITH THE
FINISHED WALL AT
THE MINIMUM ALLOWED
ROUGH IN DEPTH
ALIGNS WITH THE
FINISHED WALL AT
THE MAXIMUM ALLOWED
ROUGH IN DEPTH
4-½"
114mm
3-½"
89mm
MAXIMUM
4-3/16"
106mm
MAXIMUM
Need help?
Do you have a question about the CPV-T2-PXC and is the answer not in the manual?
Questions and answers