7.2 Parameters Settings
Go to the Device Commissioning screen and set SUN2000 parameters. For details
about entering the Device Commissioning screen, see
To set more parameters, tap Settings. For details about the parameters, see the
FusionSolar App and SUN2000 App User Manual
code to obtain the document.
7.2.1 Energy Control
7.2.1.1 Grid-tied Point Control
Function
Limits or reduces the output power of the PV power system to ensure that the
output power is within the power deviation limit.
Procedure
Step 1 On the home screen, choose Power adjustment > Grid-tied point control.