Creating A Pv Plant And A User; Optional) Setting The Physical Layout Of The Smart Pv Optimizers; Detecting Optimizer Disconnection - Huawei SUN2000 Series User Manual

Hide thumbs Also See for SUN2000 Series:
Table of Contents

Advertisement

SUN2000-(12KTL-25KTL)-M5 Series
User Manual

7.1.3 Creating a PV Plant and a User

Figure 7-5 Creating a PV plant and a user
7.1.4 (Optional) Setting the Physical Layout of the Smart PV
Optimizers
For details about the optimizer physical layout, see
or online help of the management system.

7.1.5 Detecting Optimizer Disconnection

Log in to the FusionSolar app, choose Device Commissioning > Maintenance >
Optimizer disconnection detection, tap the detection button to detect the
optimizer disconnection, and rectify the fault based on the detection result.
Issue 01 (2022-06-15)
NO TE
● In the quick settings, the grid code is set to N/A by default (automatic startup is not
supported). Set the grid code based on the area where the PV plant is located.
● For details about how to use the site deployment wizard, see
Guide
. You can scan the QR code to download the quick guide.
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 Man-Machine Interactions
FusionSolar App Quick
FusionSolar App Quick Guide
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents