Annually Inspection; As Needed - Herz firestar de Luxe 18 Operating Instructions Manual

Log wood boiler
Table of Contents

Advertisement

Item
Sensor barrier
Ash storage
Boiler room
Fire protection
11.3

Annually inspection

Item
Maintenance
Drives and
motors
ID-fan
11.4

As needed

Item
Chimney
Annual inspection, at least every 3000 operating hours
Maintenance schedule
Procedure
Clean sensors on the inside of the
intermediate hopper with soft tissue on
the left and right
Ash has to be stored in a non flammable,
air tight container till disposal.
Remove flammable materials, except
wood chips or pellets stored in a
appropriate container, from the operating
room
Check structural fire protection and fire
doors (e.g.: self-locking fire door)
Procedure
Conduct system maintenance by authorised
personnel.
Check
gear
motor
conspicuous running noises by using the
aggregate test.
Check gear motor visually for damages and
wear.
Unscrew 4x wing nut
Remove and clean ID-fan witch a brush
Procedure
Maintenance
respectively
inspection according to national standards
11
for
abnormal
or
Cleaning
and
75

Advertisement

Table of Contents
loading

Table of Contents