9
Boiler control
9.2
T-CONTROL (outside)
The T-CONTROL is positioned on the Outside of the Log wood boiler. Every single T-CONTROL parameter
is explained in chapter 9.13.
9.3
Starting the system
To switch on the display, the following condition must be fulfilled:
◼
The boiler must be connected to the power supply (see figure 9.2)
1 ... Cable ducts
2 ... Main switch
3 ... Electric supply
If it is fulfilled, the starting process of the display, which takes 1-2 minutes, starts.
20
figure 9. 1: T-CONTROL
figure 9.2: Plug on the boiler for preparation of the power supply