Mounting of SHEV control panel with housing GEH-KST................6 View motherboard............................7 DIP switch settings .............................8 Cables for D+H smoke an heat vent systems / Wiring plan (Paragon) ............9 230 V supply ..............................10 Connection overview ..........................10 Connection of smoke vent buttons ......................11 Connection of fire detector / Connenction of fire alarm system ..............12...
For all D+H SHEV systems, which have been service. The highest national and international installed by a D+H service and sales partner and are quality standards are therefore reliably fulfilled. regularly serviced, you will receive extended warranty services.
D+H maintenance notes. Only original in case of fire. Size, kind and arrangement of the D+H spare parts may be used. Repair is to be opening is of decisive significance for an optimal carried out exclusively by D+H.
Continuous duty - Alarm / Ventilation Short-time duty (30 % DC) Temperature range -5 ... +40 °C * D+H Highspeed (HS) drives will be supported. ** The total current of the control panel must not be exceeded. Housing GEH-KST GEH-S-RWA...
DIP switch settings Delivery condition S1 1 = ON OPEN-running time limitation in ventilation operation (Only if DIP switch 6 = ON). Using a potentiometer, running time in OPEN direction can be limited. If the vent button is actuated in OPEN direction, the drive will run open as long as the running time is set.
Cables for D+H smoke an heat vent systems When selecting and installing the cables, the Group cable (control panel - drive) regional electrical installation regulations At least three wire design: concerning wiring systems and the necessary - 2 wires for the supply of the drive...
VdS 2581. For this, the N– N+ Z + M D1 D2 drives must be blockage safe. All D+H drives meet this precondition. Otherwise the DIP switches has to be switched on OFF. Mounting of the drives:...
Information for starting Carry out following sight and performance checks for switching-on the smoke and heat vent control panel. Partial or incomplete connection of components can cause malfunction. All cables connected? Check following connections: mains 230 V, drives, smoke vent buttons, when necessary fire detectors and vent buttons.
Page 14
Operation - Release in case of alarm Manual opening by smoke vent button: SMOKE VENT D47 D42 D20 Reset System Line Automatic opening by fire detector: D47 D42 D20 Reset System Line Automatic opening by external control (e.g. fire alarm system): External control D47 D42 D20 Reset...
Operation - Closing after alarm Open the housings (control panel and buttons) using the enclosed keys. With manual release: In case of automatic release by fire detector or external control: Reset = OFF / ON External control Reset System Line ~ 1 Sec.
Page 16
Operation - Day-to-day ventilation Ventilation button or SHEV button with ventilation function RT 45-LT required. Open: Close: Stop: ST OP ST OP ST OP SMOKE VENT SMOKE VENT SMOKE VENT Operation - Weather automatic Only if wind detector or rain detector available. Upon triggering of the corresponding sensor, the group of the control panel is closed.
- Functional testing of connected system D+H authorized expert companies have been components specially trained by D+H for carrying out expertly - Record of competent carrying-out of this maintenance, and they get automatically the maintenance, and designation according to latest maintenance instructions.