1 - 4
•
Connect the POLYMOBIL Plus only to a line voltage supply (receptacle) that complies
with the requirements of VDE 0107 or corresponds to the local national standards.
•
Disconnect the POLYMOBIL Plus at the line voltage OFF switch on the operating
console and disconnect the line voltage plug prior to any service work.
•
Remove or insert boards with the generator switched OFF only; observe
ESD guidelines when handling boards.
Important start-up information
•
After completion of the start-up procedure, the POLYMOBIL Plus which has been
completely tested and adjusted at the factory, is ready to operate.
•
The POLYMOBIL Plus can be connected to nominal line voltages from 110 V AC through
230 V AC (
CAUTION
•
After start-up, country-specific tests are to be performed, if required;
e.g. acceptance test according to RöV (Germany - X-ray ordinance).
Acceptance test according to RöV (Germany):
Required measurements can be partially transferred from the test protocol provided.
The following values are measured at the factory and recorded in the test certificate:
•
The test / measurement values identified by the "
start-up protocol located at the end of these instructions.
POLYMOBIL Plus
±
10%) and automatically self-adjusts to the existing power line voltage.
•
Adhere to the fuse ratings for the on-site receptacle:
- 16A slow-blow (on-site) at 110
•
The line voltage cable of the POLYMOBIL Plus is supplied with a
(Schuko) safety plug.
Install line voltage plugs that comply with the local standards, if
required.
- Light localizer brightness
- Filter values - visual check
- Coincidence of light field and radiation field
- X-ray tube voltage accuracy
- mAs value check
- Reproducibility of the radiation
SPR8-125.034.01
Rev. 03
01.00
Requirements
±
±
10% or 230V
10% line voltage
" symbol should be entered in the
Page 4 of 6
TD SD 24
Medical Engineering
1
Siemens AG