Download Print this page

Bison SC2480IGA Assembly And Safe Use Manual

4" square in ground aluminum soccer goals

Advertisement

Quick Links

Assembly and Safe Use Manual
4" Square In Ground Aluminum Soccer Goals
SC2480IGA, SC2170IGA, SC1865IGA, SC1265IGA, AND SC0945IGA
P A R T S L I S T For One Pair of Goals
Item
Qty
Description
A
4
Crossbar Section (2 on 12' and 9' wide goals)
B
2
39" Inner Connecting Tubes (24', 21' & 18 1/2'
wide goals only)
C
4
Upright
D
4
Corner Section
E
14
Connecting Bar (only 12 used on 12' and 9'
wide goals)
F
48
3/8" X 1" Hex Bolt (0nly 40 used on 12' and 9'
wide goals)
G
8
Short Inner Connecting Tube
H
4
Long Inner Tube
I
4
European Backstay (Not included on
SC0945IGA)
J
4
Backstay Mounting Bracket
Inspect all contents prior to installation. Report any missing parts to dealer immediately.
Read all instructions before proceeding.
1.
Place two Crossbar Sections (A) end to end with the rear net attachment track facing upward. Insert the
39" Inner Connecting Tube (B) approximately 19 1/2" into the end of one Crossbar Section (A). Using
Connecting Bar (E) and 3/8" X 1" Hex Bolts (F) complete assembly of crossbars as shown. For ease of
installation temporarily install one 3/8" X 1" Hex Bolt (F) into Connecting Bar (E) inside of the 39"
Connecting Tube (B). Note: Not required on 12' or 9' wide goals. See Figure 1.
2.
Assemble the Corner Sections (D) to the Short Inner Connecting Tubes (G) with Connecting Bars (E)
using the 3/8" X 1" Hex Bolts (F). See Figure 2.
Implementation Date: 06/01/2022
Figure 1
Rev: 4
N.J.C.
Item
Qty
Description
K
8
5/16" X 1" Carriage Bolt
L
8
5/16" Flat Washer
M
8
5/16" X 2 3/4" Hex Bolt
N
50
Net Attachment Clip
O
16
5/16" Lock Nut
P
16
Net Ground Stake
Q
2
Net
R
4
Optional SC44S Ground Sleeve
S
TBD
Quick Dry Cement (Provided by customer)
T
4
Pole Installation Aid Kit
Figure 2
File: \publisher\instruction\SCIGA44
1
Customer Service
(800) 247-7668
Ref#:860157

Advertisement

loading

Summary of Contents for Bison SC2480IGA

  • Page 1 Assembly and Safe Use Manual 4” Square In Ground Aluminum Soccer Goals SC2480IGA, SC2170IGA, SC1865IGA, SC1265IGA, AND SC0945IGA Customer Service (800) 247-7668 P A R T S L I S T For One Pair of Goals Item Description Item Description Crossbar Section (2 on 12’...
  • Page 2 With the rear net attachment track facing upward, attach the corner assemblies from instruction #2 above onto the ends of each crossbar assembly from instruction #1 above using the 3/8” X 1” Hex Bolts (F). See Figure 3. Attach the Uprights (C) to the crossbar and corner assemblies in instruction #3 above using the 3/8” X 1” Hex Bolts (F).
  • Page 3 It will take approximately 1.25 cubic feet of Quick Dry Cement (S) for each hole depending on the actual size you dig your holes, less if you are installing optional SC44S Ground Sleeves (S). Always better to have too much rather than too little. Please allow 48 hours for the concrete to completely cure before removing supports.

This manual is also suitable for:

Sc2170igaSc1865igaSc1265igaSc0945iga