Download Print this page

Ericsson RBS 6402 Installation Manual page 11

Advertisement

4. Install Mounting Bracket and Prepare Cables
D R IL
L IN G
T E M P
L A T E
/ Q U IC
K G U
ID E
56/1531-LZA 701 6001 Uen D | 2015-11-06
If applicable, insert the SFP module in the port marked WAN B.
For more information about handling SFP modules, refer to Handling
SFP Modules and Optical Cables and SFP Module Selector Guide.
Ge7104A
Protect the RBS and cables from dust by keeping them in the box
when drilling.
Put the drilling template on the wall and ensure that it is straight by
using a spirit level. Make sure that the entire drilling template fits on
the wall without it folding around any corners. Use the double-sided
tape at the corners of the template to attach it to the wall.
Ge7009A
If applicable, drill the three holes marked on the drilling template.
Ge7010A
Attach the two upper screws in positions to hang the mounting
bracket.
Ge7011A
Install RBS
7

Hide quick links:

Advertisement

loading