Appendix Ninstalling The Power Switch And Power/Feed Switch Cover; Installing The Switch Cover - Epson EU-m30 Series Developer's Manual

Table of Contents

Advertisement

Appendix N
N.1

Installing the Switch Cover

Step 1:
Clean the area around the switch.
Step 2:
Peel off the switch cover's double-sided adhesive tape, and affix such that the switch cover's rear
protrusions enter the power switch's recesses.
INSTALLING THE POWER SWITCH AND POWER/FEED SWITCH COVER
Figure N.1
Figure N.2
69

Advertisement

Table of Contents
loading

Table of Contents