Check Up; Repair; Test; Putting Out Of Operation - Liquidation - Brano 15-00 Operation Manual

Rack jack
Table of Contents

Advertisement

11.5 CHECK UP

Check up, whether all disassembled parts are suitable for next use.
1. Check up, whether no parts are worn out and have no chutes or fissures.
2. Check up, whether threaded parts have not the damaged thread.

11.6 REPAIR

Outworn or damaged parts must be replaced.
Remove little burrs and scratches or other minor surface defects and flatten out with
fine grinder or abrasive cloth.

11.7 TEST

The load test must be performed at all repaired jacks by qualified person with the
load exceeding the load capacity by 10% for verification of function and brake of the
jack.
12 PUTTING OUT OF OPERATION – LIQUIDATION
The jack do not contain any noxious agents, its parts are from steel and cast iron.
Hand over the jack after putting out of operation to the firm dealing with liquidation of
waste metal.

13 LATED DOCUMENTATION

of Law as amended
13.1 EC declaration of conformity
13.2 The Operation Manual was elaborated in accordance with following technical
regulations, technical standards and national regulations:
• Ministerial order No.176/2008 of the Collection of Law as amended (EP and
Council directive 2006/42/EC)
• Ministerial order No.116/2016 of the Collection of Law as amended (EP and
Council directive 2014/34/EU)
• ČSN EN ISO 12100
• ČSN EN 1494+A1
• ČSN EN 1127 - 2
• ČSN EN 1127 - 1
• ČSN EN ISO 80079-36
• ČSN EN ISO 80079-37
• Regulation of CBM (Czech Bureau of Mine) No.22/89 of the Collection of Law
• ČSN CLC/TR 60079-32-1
14 FINAL REQUIREMENTS OF THE PRODUCER TO THE
CUSTOMER
Any changes of the product, eventually usage of unoriginal spare parts can be
realized only based on the approval of the producer.
When not observing this condition the producer does not guarantee safety of
his product. In this case, any producer's guarantees do not apply to the
product.
17

Advertisement

Table of Contents
loading

Table of Contents