Overview - BITMAIN T19 Hydro Server Installation Manual

Table of Contents

Advertisement

1. Overview

The T19 Hydro server is one of the Bitmain's newest versions in the 19 hydro server series. Power supply APW11 is part of T19
Hydro server. All T19 Hydro servers are tested and configured prior to shipping to ensure easy set up.
Caution:
1. Please refer to the layout above to place your goods in usage in case of any damage.
2. DO NOT remove any screws and cables tied on the product.
3. Please note that the actual server shall prevail.
4. There must be an external specific Surge Protection device complying with IEC/EN 61643-11 either in front of the
power supply or outside the end system (in a separate distribution box or as part of the building installation).
5. Do not plug or remove the device when it is powered on.
6. The external of the power supply shall have a disconnecting device, which can disconnect L1&L2&L3 simultaneously.
7. The T19 Hydro server shall be used simultaneously with the ANTSPACE HK3. Please click
HK3.
- 4 -
T19 Hydro Server Installation Guide
1. Overview
here
for more details of ANTSPACE

Advertisement

Table of Contents
loading

Table of Contents