Download Print this page

DAXOM UKDAX-10EBT Manual page 26

Hide thumbs Also See for UKDAX-10EBT:

Advertisement

6.2. Control Buttons
Control of the device is done with buttons placed under the LCD Display.
6.3. Operation Of Device
First operation of the device must be absolutely done by authorized service.
Our company is not responsible from damages and accidents which can be
occured with intervention to device by unauthorized people.
Before operating the device, suitability of all mechanic and electrical connections
must be controlled. Boiler and heating system must be completely filled and
radiator vent must be done. Our company is not responsible from damages and
accidents which can be occur because of wrong connection.
Follow following points for operation of device.
. Make sure that device water and radiator valves are open
. Open residual current device then fuse.
After all symbols on the LCD screen appear a few min, LCD screen will be as in
the following
26

Advertisement

loading