SUGGESTED IN-GROUND FOUNDATION
12.0
SECTION A - A
NOTES:
2 1/2" schedule 40 pipe should conform to ASTM A53.
1.
2.
All concrete should conform to building code standards and have a minimum compressive
strength of 3000 PSI at 28 days. (Per ACI-318-77)
3.
Soil bearing capacity should be no less than 2000 PSF.
4.
Concrete should be poured against undisturbed soil.
5.
Allow concrete 24 hours set time before installation of antenna.
6.
The antenna should be properly grounded to meet applicable local codes.
7.
Minimum depth as shown or extend to local frost line.
8.
Foundation meets the design requirements as set forth by the uniform building code.
(1982 edition)
(CPI DOES NOT REPRESENT OR WARRANT THAT ANY PARTICULAR DESIGN OR SIZE OF
FOUNDATION IS APPROPRIATE FOR ANY LOCALITY OR EARTH STATION INSTALLATION.)
30.0
A
30.0
SEE NOTE #7
FIGURE 1.
6
1.2M Ku-BAND Rx/Tx SERIES 1132
2 1/2" SCH 40 PIPE
(2.88 O.D.)
A
45
4096-630