Download Print this page

Monitor Unit - Furuno FAR-2318 Installation Manual

Hide thumbs Also See for FAR-2318:

Advertisement

1. INSTALLATION
ing the double nuts, see the installation guide (C3900Y01) at the back of this man-
ual.
5. Arrange the ground point at a location on the mounting platform that is within 300
mm from the ground terminal on the antenna unit. Fasten the ground wire (RW-
4747, 340 mm) there, using the M6x25 hex bolt, nut and washers.
6. Connect the other end of the ground wire to the ground terminal on the antenna
unit.
7. Coat the ground terminal, ground point on the mounting platform and fixing bolts
on the antenna unit with adhesive (supplied).
Adhesive
Ground
terminal
Ground terminal provided on
antenna base.
Arrange ground terminal as close
as possible to antenna unit.
1.3

Monitor Unit

See the operator's manual for MU-190 (OMC-44670), MU-231 (OMC-44690), MU-
270W (OMC-44930) or MU-190HD (OMC-44570) for the installation procedure. Keep
in mind the following points when selecting a location.
• Locate the monitor unit where no framing is installed immediately in front of the
monitor.
• Locate the monitor where the display is easily visible in all ambient lighting condi-
tions.
1-18
Antenna
Antenna
chassis
chassis
Ground wire
Lay corrosion-proof rubber
mat, bolt antenna unit to
mounting location, and oat
exposed hardware with
G1̲1/4‑A
anticorrosive sealant.
Method 1
Grounde
Grounde
wire
wire
Adhesive
Adhesive
Method 2
Grounde
Grounde
wire
wire
Welding
Welding
Flat washer
Antenna chassis
Antenna chassis
Flat washer
Spring washer
Hex. nut
Adhesive
Adhesive
Hex. nut
Spring washer
Flat washer
Hex. bolt
Antenna chassis
Antenna chassis

Advertisement

loading