Goodwe SEC1000S User Manual
Goodwe SEC1000S User Manual

Goodwe SEC1000S User Manual

Smart energy controller
Hide thumbs Also See for SEC1000S:

Advertisement

Quick Links

User Manual
Smart Energy Controller
SEC1000S
V1.3-2023-07-15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SEC1000S and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Goodwe SEC1000S

  • Page 1 User Manual Smart Energy Controller SEC1000S V1.3-2023-07-15...
  • Page 2: Table Of Contents

    2 Safety and Warning ................01 3 System Networking ................02 4 Mounting ..................... 03 4.1 Mounting Instruction ..................03 4.2 Overview and Packaging ...................03 4.2.1 SEC1000S Overview .......................03 4.2.2 Package ..........................03 4.3 SEC1000S Installation ..................03 4.3.1 Selecting the installation location ................03 4.3.2 Mounting Procedure .....................04 5 Electrical Connection ................
  • Page 3: Symbols

    SEC1000S and Grid, is disconnected before performing any installation or maintenance. • When in operation, users should not touch any of the electrical parts of SEC1000S, like internal components or cables to avoid electic shock. • All electrical installations must comply with local electrical standards and obtain permission from local power authorities before SEC1000S can be connected to the grid by professionals.
  • Page 4: System Networking

    1. The system supports up to 10 inverters, please distribute them equally to each COM port. 2. No separate Smart Meter is required in inverter paralleling system along with SEC1000S deployed. This solution is only applicable to the paralleling of on-grid side not to back-up side. There are special requirements on the version of firmware of ET, ET PLUS+ or BT applied in this solution, with DSP version 01 or newer and ARM version 09 or newer.
  • Page 5: Mounting

    4 Mounting 4.1 Mounting Instruction • SEC1000S must be installed where there is no significant shaking, shock vibration and no direct rain or snow. • SEC1000S shall be installed at eye level for easy operation and maintenance. • SEC1000S shoud not be installed near inflammable and explosive items. Any strong electro- magnetic equipment should be kept away from installation site.
  • Page 6: Sec1000S Installation

    • The installation location must be well ventilated. • SEC1000S can be placed horizontally or installed vertically. • The SEC1000S must be installed vertical or with a backward tilt less 15°.No sidwways tilt is allowed. The connection area must point downwards.
  • Page 7: Mounting Procedure

    Step 1 Drill holes on the wall,8mm in diameter and 45mm deep. Step 2 Fix the wall mounting bracket on the wall with expansion bolts in accessory bag. Step 3 Place SEC1000S on the wall-mounted bracket. Step 4 Fix the SEC1000S to the bracket using screws.
  • Page 8: Electrical Connection

    5 Electrical Connection 5.1 Safety Precaution DANGER • Before electrical connections, disconnect all upstream switches to ensure the device is not energized. Do not work with power on. Otherwise, an electric shock may occur. • Perform electrical connections in compliance with local laws and regulations. Including operations, cables, and component specifications.
  • Page 9 DRED COM/DRM0 REFGEN DRM4/8 Inverter 1 DRM3/7 DRM2/6 10R S1a DRM1/5 Inverter n (n≤10) REF1 DI_1 100% PF=1 DI_2 PF=0.95 DI_3 PF=0.9 DI_4 REF2 PF=0.85...
  • Page 10: Conneting The Pe Cable

    5.3 Conneting the PE Cable WARNING • Make sure the equipment is reliably grounded before any operations. • To improve the corrosion resistance of the terminal, it is recommended to apply silica gel or paint on the grounding terminal after installing the PE cable. •...
  • Page 11: Conneting The Ct Cable

    • Install three set of external CT to the power cables. CT_A (A+/A-) connects phase L1, CT_B (B+/B-) connects phase L2, and CT_C (C+/C-) connects phase L3. • The CT with a secondary current of 5A should be prepared by customers. Recommended specifications of GoodWe CT: Range of current tested Content Remark Backflow CT, closed type CT 200A Acrel/AKH-0.66(200A/5A)
  • Page 12: Conneting The Rs485 Cable

    Step 1 Cut and strip the prepared RS485 cable. Step 2 Insert RS485+ and RS485- wire into the 2-pin terminal. Step 3 Insert the 2-pin terminal to COM1, COM2 or COM3 of SEC1000S. Step 4 Disassemble the 18pin communication terminal of the inverter, and connect the other end of the RS485 cable to the 18pin terminal.
  • Page 13 Step 1 Cut and strip the prepared standard network cable. Step 2 Insert orange&white and orange wire into the 2-pin terminal. Step 3 Insert the 2-pin terminal to COM1, COM2 or COM3 of SEC1000S. Step 4 Remove the RS485 cap of the inverter.
  • Page 14: Conneting The Network Cable

    5.7 Conneting the Network Cable NOTICE • The standard network cable should be prepared by customers. 5.8 Conneting the DI Cable NOTICE • The EzLoggerPro offers Demand Response Enabling Device(DERD) signal control port, meeting DRED certification requirements in Australian and other regions. •...
  • Page 15 Port Silkscreen Port definition for DRED Port definition for RCR REF1 RefGen DRM1/5 D_IN1 DRM2/6 D_IN2 DRM3/7 D_IN3 DRM4/8 D_IN4 REF2 Com/DRM0 DRED Connection DI_1 DI_2 DI_3 DI_4 REF1 REF2 10R S1a RCR Connection D I _ 1 D I _ 2 D I _ 3 D I _ 4 REF1...
  • Page 16: System Commissioning

    The parameters of the SEC1000S shall be set by professionals. Incorrect settings may affect system operation and power generation. Please refer to the EzloggerPro User Manual for the commissioning of the SEC1000S. For more details, scan the QR code below to get the user manual.
  • Page 17: Technical Parameters

    8 Technical Parameters Model SEC1000S Communication Max. Inverters Supported RS485 interface 1*RJ45, 10/100 Mbps Ethernet Configuration Ezlogger*1 Datalogger GM3000*1 Meter 100–280Vac, 50/60 Hz Power Supply Power Consumption (W) ≤10 Mechanical 350*460*143 Dimensions (W×H×D mm) Weight (kg) Wall mounting, bracket mounting, pole mounting...
  • Page 18 GoodWe Website GoodWe Technologies Co., Ltd. No. 90 Zijin Rd., New District, Suzhou, 215011, China www.goodwe.com service@goodwe.com 340-00711-01 Local Contacts...

Table of Contents