Table of Contents

Advertisement

[ENG] NetPing 2 IP PDU ETH 53R14 & NetPing 2 IP PDU GSM3G 203R15, User guide -[ENG][2PWR] Connection, Installion, and

Step 4

Connect the equipment (the load) the power of which should be controlled, to the «PWR» sockets at the back panel
of a device. Power cords or adapters for connecting devices are not included in the shipping kit.
Connect external sensors or running devices to the IO lines of a
Installing, and Initial Configuration of a
External sensors and load should be connected only when a device is powered off.
Important! It is not recommended to connect the real network and computer equipment to the device at once
at the first switching on and getting acquainted with the operation logic of the device. Frequent cycles of
switching on/off can cause the failure of the equipment. For the time of getting acquainted with the device, it is
possible to plug any indifferent load to the power sockets (for example, a table lamp) or track a power status at
power sockets watching the glowing of the corresponding LEDs.
Device»).
[ENG][2PWR] Connection, Installion, and Initial Configuration of the Device
Initial Configuration of the Device
device (see the details in the section
«Connecting,
                             – 

Advertisement

Table of Contents
loading

This manual is also suitable for:

2 ip pdu gsm3g 203r15

Table of Contents