Step 4 Remove 3 screws (for deck 1 & 2).
Step 5 Remove capstan belt A/B.
Step 6 Remove the flywheel R.
Step 7 Release the claw and remove the winding lever and spring.
[Installation of the belt]
Step 1 The boss and marking should be positioned horizontally.
55