a) Connect the batteries to the terminals observing polarity (with the red wires to be connected to
the positive battery leads).
b) Turn on the mains power 220V, 50 Hz.
c) Apply 220V power to the box using the QF1 and QF2 circuit breakers.
Monitor the ShPS-12 status against LED indicators.
2.2.6.3. Turning the ShPS-12 Off
a) Turn off the QF2 and QF1 circuit breakers.
b) Disconnect the input 220 V/AC.
c) Disconnect the batteries.
d) Disconnect the load.

2.2.7 Performance Testing

2.2.7.1. A full testing of the ShPS-12 performance is carried out only by the manufacturer or in
special labs.
1) Turn on the ShPS-12 in line with 2.2.6.2.
2) Check operation of the ShPS-12, its indicators and its buzzer against the Table 3. Measure the
output voltage at the BK-12; it should be within the range stated in 1.2.4.
3) Shut off the mains power for a time of 5 minutes at least. Verify that the ShPS has started to be
powered by the batteries. Verify that the indicators and the buzzer operate as stated in Table 3.
Measure the output voltage and verify that it is within the range stated in 1.2.4.
4) Turn the mains on and verify that the indicators and the buzzer operate as stated in Table 3.
The ShPS-12 is considered to be operational if the requirements of items 2.2.7.1-2) – 2.2.7.1-4) are
met.
2.2.7.2. ShPS-12's Batteries Capacity Measurement
To make the capacity measurement available, the battery charge level shall be more than 80%.
Note: The battery charge volume being less than 80%, the ShPS-12 cannot measure the capacity of
installed batteries.
a) To measure the ShPS-12 battery capacity using the S2000M panel, please use the Test
Detector function (see S2000M Users' Guide). When initiating a testing command, please specify '0'
for detector address and test duration. When this command is received and executed, the ShPS-12
issues the Test Starts event. The test will be completed automatically. With this test being completed,
the ShPS-12 issues the Test Ends event.
To turn the testing procedure on and off:
CODE:_
v6 SERVICE
v63 TEST SYSTEM COMPONENTS
vTEST ON
ADDRESS:_
COMPONENT#:_
TIME, min:_
vTEST OFF
ADDRESS:_
COMPONENT#:_
Enter a pass code.
Select the Service item using the 43buttons and press
press 6 for quick navigation.
Select the Test System Components item using the 43buttons
and press
, or press 3 for quick navigation.
To initiate a test, please select the Test ON menu item using
the43buttons and press
Enter the ShPS-12 address (1 to 127), or select a required one us-
ing the 43keys and press
Enter 0 for the component number and press
Enter 0 for the test duration time and press
To complete the capacity measurement procedure, please select
the Test OFF item using the 43keys and press
Enter the ShPS-12 address (1 to 127), or select the required one
using the 43keys and press
Enter '0' as the component number and press
.
.
.
.
.
.
, or
.
17