Global Schedule 1-5 - Tech Controllers EU-M-8N User Manual

Table of Contents

Advertisement

3.2.

GLOBAL SCHEDULE 1-5

Global schedules are available in all zones – in each zone only one such schedule may be activated. The global schedule
settings apply automatically in all remaining zones where a given global schedule is active.
How to edit a schedule:
After entering the schedule editing screen, the schedule may be adjusted to the user's needs. The settings may be configured
for two separate groups of days – the first group marked with orange colour, the other one with grey colour. It is possible to
assign up to 3 time periods with separate temperature values to each group. Outside these periods of time, a general pre-set
temperature will apply (its value may also be edited by the user).
1
1. General pre-set temperature for the first group of days (orange colour – in the example above the colour is used to
mark working days Monday-Friday). The temperature applies outside the time periods defined by the user.
2. Time periods for the first group of days – the pre-set temperature and the time limits. Tapping on a given period
opens up an editing screen.
3. General pre-set temperature for the second group of days (grey colour – in the example above the colour is used to
mark Saturday and Sunday).
4. In order to add new periods, tap on „+".
5. Days of the week – orange days are assigned to the first group whereas grey days are assigned to the second one.
In order to change the group, tap on a selected day.
The time period editing screen enables the user to adjust the pre-set temperature and the time limits of the period with the
accuracy of 15 minutes. If the time periods overlap, they are marked with red colour. Such settings cannot be saved.
2
3
14
4
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EU-M-8N and is the answer not in the manual?

Questions and answers

Table of Contents