Initial Commissioning - KERN EMS 300-3 Instruction Manual

School balance
Hide thumbs Also See for EMS 300-3:
Table of Contents

Advertisement

If the batteries are run down, "LO" appears in the display. Press ON/OFF-key and
replace the batteries immediately.
If the balance is not used for a longer time, take out the batteries and store them
separately. Leaking battery liquid could damage the balance.
If there exists an optional rechargeable battery, it has to be connected in the battery
compartment via a separate plug-in socket. Now the mains adapter delivered with the
rechargeable battery must be applied.

5.5 Initial Commissioning

In order to obtain exact results with the electronic balances, your balance must have
reached the operating temperature (see warming up time chap. 1). During this
warming up time the balance must be connected to the power supply (mains,
accumulator or battery).
The accuracy of the balance depends on the local acceleration of gravity.
Strictly observe hints in chapter Adjustment.
5.6 Adjustment
As the acceleration value due to gravity is not the same at every location on earth,
each balance must be coordinated - in compliance with the underlying physical
weighing principle - to the existing acceleration due to gravity at its place of location
(only if the balance has not already been adjusted to the location in the factory). This
adjustment process must be carried out for the first commissioning, after each
change of location as well as in case of fluctuating environment temperature. To
receive accurate measuring values it is also recommended to adjust the balance
periodically in weighing operation.
EMS-BA-e-1112
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ems 3000-2Ems 6k0.1Ems 6k1Ems 12k0.1Ems 12k1

Table of Contents