Load Transients

2.5 Load Transients

The TPS54350EVM−235 response to load transients is shown in Figure 2−6.
The current step is from 25% to 75% of maximum rated load. Total
peak-to-peak voltage variation is as shown, including ripple and noise on the
output.
Figure 2−6. Load Transient Response, TPS54350
2-6
V O (AC) 10 mV/div
I O 1 A/div
t − Time − 200 µs/div