5.10 Powering Up The System - Emerson AXP640-DC2 Installation & Use Manual

Table of Contents

Advertisement

AXP640 Shelf Installation
8. Verify that the PEM circuit breakers are in the ON position.
9. Break the tagout or lockout seals on the branch circuit or power distribution unit.
10.Apply power by closing the branch circuit or power distribution unit.
The OOS indicator LED will glow solid red and the other LEDs will go dark. The OOS
will not go dark and the IS indicator LED will not illuminate until the external power
circuit breakers are closed.
11.Verify that all FRU LEDs illuminate and the PEM's IS LED is green, and the OOS LED
is dark.

5.10 Powering Up the System

With the installation cabled up, you are ready to apply power to the system.
Cover all open module slots and put all approved filler panels in place before turning on
power. This is necessary to properly cool the chassis and to avoid electrical shock and other
possible hazards. Slot covers and panels must remain in place during system operation.
Procedure
Follow these steps to power up the system:
1. Push the PEM circuit breakers to the ON position.
2. Verify that all FRU LEDs illuminate and the PEM's In Service LED is green.
The system executes its normal start-up routine and is then ready to use.
98
AXP640 Installation and Use (6806800M24E)

Advertisement

Table of Contents
loading

Table of Contents