Site Preparation
3.3
Site Planning Checklists
The following table lists the tasks which you have to perform as plan the installation of the
system.
Figure 3-12
Planning Step
Determine where to install the system and
ensure that the required installation tools
and equipment are available
Control the available installation tools and
equipment
Ensure that enough space is available
Determine the needed power
Plan the cable management
Ensure proper cooling
Schedule the arrival of the system
Consider consulting of Emerson services
74
Planning Checklist 1
Done
AXP640 Installation and Use (6806800M24E)