Setup For 2706-P9Xc2-Sc - Spectrum Controls InView 2706-PENETx2-SC Quick Start Manual

Industrial message displays
Table of Contents

Advertisement

Setup for 2706-P9xC2-SC

Please follow these instructions to setup the P22R display.
2706-PENETK2-SC
1
Wire the comms module to the display as shown in the above wiring diagram.
2
Connect power as shown in the above wiring diagram.
3
With CAT5 cable, connect the comms module to an unmanaged switch.
4
Connect the unmanaged switch to both your PC and PLC with CAT5 cable.
IMPORTANT – PC & PLC must be in the 192.168.1.x subnet!
06
www.spectrumcontrols.com
Copyright ©2015 Spectrum Controls, Inc., all rights reserved. Part No. 0100249-04 Rev 9/2015
Eth1: 192.168.1.100
PC
PLC