Install The Header Bracket - Craftsman CMXEOCG232 Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION STEP 2

INSTALL THE HEADER BRACKET

You can attach the header bracket either to the wall above the garage
door, or to the ceiling. Follow the instructions which will work best for
your particular requirements. Do not install the header bracket over
drywall. If installing into masonry, use concrete anchors (not
provided).
WALL HEADER BRACKET INSTALLATION
1. Center the bracket on the vertical centerline with the bottom
edge of the bracket on the horizontal line as shown (with the
arrow pointing toward the ceiling).
2. Mark the vertical set of bracket holes. Drill 3/16" pilot holes
and fasten the bracket securely to a structural support with the
hardware provided.
Figure 1
UP
Optional
Mounting Holes
Header Wall
Header
2x4
Bracket
Structural
Support
Horizontal
Line
Highest Point of
Garage Door Travel
Wall Mount
Vertical
Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"
Door Spring
Garage Door
Vertical
Centerline
of Garage Door
CEILING HEADER BRACKET INSTALLATION
1. Extend the vertical centerline onto the ceiling as shown.
2. Center the bracket on the vertical mark, no more than 6"
(15 cm) from the wall. Make sure the arrow is pointing away
from the wall. The bracket can be mounted flush against the
ceiling when clearance is minimal.
3. Mark the side holes. Drill 3/16" pilot holes and fasten bracket
securely to a structural support with the hardware provided.
Figure 2
Header
Bracket
6" (15 cm) Maximum
Door
Spring
Garage Door
HARDWARE SHOWN ACTUAL SIZE
Lag Screw
5/16"-9x1-5/8"
14
Ceiling Mounting Holes
UP
Finished Ceiling
Vertical Centerline
of Garage Door
Lag Screws
5/16"-9x1-5/8"
Header Wall
Vertical
Centerline
of Garage Door

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cmxeocg472

Table of Contents