OPERATIONAL TEST

1 Ensure that the Digital Mixer is installed correctly installed according to the instructions above.
Turn on the water supply and check the unit and plumbing for leaks. Once the plumbing is confirmed to
be water-tight, connect the power supply and conduct the operational test below.
OPERATING THE CONTROL SYSTEM
1 Open
Push the interface once. The interface turns on and the
LED illuminates.
2
Close
Push the interface again. The interface turns off and the
LED goes off.