Download Print this page
Xylem LOWARA Operating And Maintenance Instructions
Xylem LOWARA Operating And Maintenance Instructions

Xylem LOWARA Operating And Maintenance Instructions

Presfix fill set

Advertisement

Quick Links

Operating and Maintenance Instructions
EC Declaration of conformity
Xylem Water Solutions UK Limited declare that the Presfix pressurisation set conforms to the requirements of
the Machinery Safety Directive
Conforming to the UK Health & Safety Requirements
Water supply (Water fittings) regulations
Code of practice for heating and chilled water systems
Signed:
t
Clive Willmot
Introduction
This leaflet contains information to enable the safe installation and operation of the products mentioned above.
The following instructions must be read and understood by all persons responsible for the installation, operation
and maintenance of this product.
Warning Symbols
Safety instructions where noncompliance would affect safety.
Safety instruction where electrical hazard is involved.
Safety instruction where noncompliance could cause damage to the equipment.
Instruction for safe use
This product has been designed for the pressurisation of sealed heating, chilled water and closed-
condenser water systems to the operating conditions shown.
This product should not be installed until this leaflet has been studied carefully.
Handling, transportation and installation of this equipment should only take place with the proper
use of lifting equipment.
This product must be stored in a frost-free dry environment.
Noise Emissions
This equipment operates at a noise level lower than
Protection degree
Presfix Fill Set
2006/42/EC.
2008 No.1597
1999
BS7074 (parts 1, 2 & 3)
Position: Engineering manager
70dBA.
IP2X
1
Date: 20-04-2016 Revision B

Advertisement

loading

Summary of Contents for Xylem LOWARA

  • Page 1 Presfix Fill Set Operating and Maintenance Instructions EC Declaration of conformity Xylem Water Solutions UK Limited declare that the Presfix pressurisation set conforms to the requirements of the Machinery Safety Directive 2006/42/EC. Conforming to the UK Health & Safety Requirements 2008 No.1597...
  • Page 2 Installation The Presfix Fill unit is despatched mounted on a wooden pallet and covered in a protective film, it is recom- mended that the unit be retained in the protective packaging until the product is to be installed. The unit will arrive pre-packaged and wired ready for installation. This product has been fully run tested at our works under simulated site conditions.
  • Page 3 Commissioning 1. Commissioning should be carried out in conjunction with the main pressurisation set commissioning de- tails. Fill the main system with water via the quick fill filling loop to the system fill pressure, this filling loop must comply with local water authority bylaws and contain double check valves. The filling loop must be completely removed after the system has been filled.
  • Page 4 Axminster, Devon EX13 5HU - UK Tel: 01297 630230 Fax: 01297 630270 lowaraukenquiries@xyleminc.com www.lowara.co.uk www.xyleminc.com Lowara is a trademark of Xylem Inc. or one of its subsidiaries. © 2016 Xylem, Inc. Lowara reserve the right to make modifications without prior notice. Code UKLIT0124 P04/16...