SUN600-(5KTL, 6KTL)-L0
User Manual
6.2 System Power-On
Prerequisites
Before turning on the AC switch between the inverter and the power grid, use a
multimeter to check that the AC voltage is within the allowed range.
If the DC power supply is connected but the AC power supply is disconnected, the
inverter will report a Grid Loss alarm. The inverter can start properly only after
the power grid recovers.
Procedure
Step 1 Turn on the AC switch between the inverter and the power grid.
Step 2 (Optional) Remove the locking screw from the DC switch.
Figure 6-1 Removing the locking screw from a DC switch
Step 3 Turn on the DC switch between the PV string and the inverter if there is any.
Step 4 Turn on the DC switch at the bottom of the inverter.
Step 5 Observe the LEDs to check the inverter operating status.
Table 6-2 LED indicators 1
Category
Running indicator
Issue 02 (2022-03-10)
NO TICE
Status
LED1
Steady green
Blinking green at long
intervals (on for 1s
and then off for 1s)
Copyright © Huawei Technologies Co., Ltd.
LED2
Steady green
Off
6 System Commissioning
Description
–
The inverter is
operating in grid-tied
mode.
The DC is on and the
AC is off.
52