Mutable Instruments Anushri Assembly Instructions Manual page 4

Hide thumbs Also See for Anushri:
Table of Contents

Advertisement

Mutable Instruments | Anushri - Assembly instructions
Start with the 100's decade:
4x 220R resistors (red, red, black, black) at positions R1, R3, R4, R13.
11x 470R resistors (yellow, purple, black, black) at positions R5, R6, R9, R10, R21, R22, R27, R51,
R55, R57, R62.
The 1k's decade:
7x 4.7k resistors (yellow, purple, black, brown) at positions R25, R38, R39, R45, R50, R52, R53.
https://mutable-instruments.net/archive/anushri/build/
1/17/18, 8'04 AM
Page 4 of 23

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Anushri and is the answer not in the manual?

Questions and answers

Related Products for Mutable Instruments Anushri

Table of Contents