Sharp VL-E610S Service Manual page 33

Hide thumbs Also See for VL-E610S:
Table of Contents

Advertisement

(7) Drum ass'y
Install the drum ass'y on the main chassis, and tighten the screws (3 pcs.).
(8) Tape guide
Align the positioning pin, and tighten the screw (one pc.).
4-5-5. Phase matching
The phase of the following parts must be matched as shown in the figure below.
(Ascertain that the
marks and round holes align.)
(1) Lo relay gear
(2) Main cam
Phase
alignment mark
(Round hole)
4-6. MECHANISM ASSEMBLING METHOD
(1) Adjust the phase of each part.
(2) Install screws and washers.
(3) Install the segment gear, T arm guide and the M-function lever. Install the eject lever.
a
T arm guide Segment gear
Move claw to
rear side.
B
(3) Sub-cam
(4) Mode switch
Lo relay gear
Phase alignment mark
(
Mark)
a S Tight M1.4 x 3
B ø0.8-ø3.0-t0.2
M-function lever
Move claw
to rear side.
4-19
Mode switch
Phase alignment mark
(Round hole)
Item
Tightening torque
70mN·m (0.7kgf·cm)
VL-E610S/VL-E610H
VL-E660S/VL-E96E
VL-E98E
Quantity
1
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vl-e610hVl-e660sVl-e96eVl-e98e

Table of Contents