Inspection Schedule; Condenser Module Assembly Inspection Schedule; Table 5 Condenser Module Inspection - Safran PILATUS PC12 M19 Manual

Table of Contents

Advertisement

 

7. INSPECTION SCHEDULE

7.1. Condenser Module Assembly Inspection Schedule:

NOTE: This is the recommended visual inspection schedule for the Condenser Module Assembly.
Adherence to this schedule will ensure that all components of the assembly are in accordance with the
manufacturer's specifications and is necessary to detect structural failure, deterioration or damage, and to
determine the need for corrective action.
7.1.1. If any component listed in this schedule requires cleaning, refer to Cleaning Procedure
(Section 6).
7.1.2. If any component listed in this schedule requires repair and/or replacement, refer to Repair
(Section 8).
Component
Condenser
fan/outlet
shrouds
Condenser coil
Electrical wiring
Receiver dryer
assembly
Copyright © 2020 
Page | 27 
CHECK (INSPECTION SCHEDULE)
Table 5 Condenser System Inspection
Type Inspection
Inspect condenser shrouds for signs of cracking,
separation between shrouds and condenser coil.
Inspect condenser coil for damage or dirt accumulation.
Inspect, clean and comb coil fins. Inspect
for leakage. Inspect plumbing for damage
weathering and wear
Inspect return bends for nicks, dents, cracks, or other
damage.
Inspect wiring for insulation damage, replace as required.
Inspect for leakage. Inspect plumbing for damage,
weathering, and wear.
Verify mounting hardware is secure
Original Release 
12037 N Highway 99
Seminole, OK 74868
Phone (405) 382-0731
www.enviro-ok.com
passenger
www.safran‐
Interval
12 months
12 months
12 months
12 months
ATA 21‐00‐60 
‐solutions.com

Advertisement

Table of Contents
loading

Table of Contents