Download Print this page

Advertisement

Available languages

Available languages

Quick Links

INSTALLATION MANUAL
Steel Front 741SFB
Approved for use with Valor heater models 738, 739 and
RF24B heaters installed in RA24ZC Zero Clearance Kit
DANGER
!
A barrier designed to reduce the risk of burns from the hot
viewing glass is provided with this appliance and must be
installed for the protection of children and other at-risk
individuals.
The 741SFB Steel Front in black is designed to be used
along with an outer surround trim (supplied separately)
on the Valor G3 heaters 738 or 739 or Retrofire RF24B
when installed in the RA24ZC Zero Clearance Kit.
The Steel Front fits within the outer surround trim and
clips onto the standard mounting brackets supplied with
the heaters and ZC kit.
The Steel Front is compatible with all outer surround
trims and cast iron surrounds available for use with the
heaters 738, 739 and RF24B when installed in RA24ZC.
The Steel Front is equipped with a barrier screen. The
barrier screen is designed specifically to prevent any
contact with the glass of the fireplace which becomes
hot during operation and remains hot when cooling.
4001895-08
© Copyright Miles Industries Ltd., 2022
G3 Series
HOT GLASS WILL
CAUSE BURNS.
DO NOT TOUCH GLASS
UNTIL COOLED.
NEVER ALLOW CHILDREN
TO TOUCH GLASS.
INSTALLER: Leave this
manual with the appliance.
CONSUMER: Retain this
manual for future reference.
Note: This kit must be
installed or serviced by a
qualified installer, service
agency or gas supplier.
These instructions are to be
used in conjunction with the
main installation instructions
for the above listed heater
model.
Overview (Heater and trim sold separately)
738, 739 or
RF24B in
RA24ZC
Trim
Steel Front

Advertisement

loading

Summary of Contents for Valor G3 Series

  • Page 1 (supplied separately) RF24B in RA24ZC on the Valor G3 heaters 738 or 739 or Retrofire RF24B when installed in the RA24ZC Zero Clearance Kit. The Steel Front fits within the outer surround trim and clips onto the standard mounting brackets supplied with the heaters and ZC kit.
  • Page 2: Installation

    738/739 and RA24ZC Mantel Clearances 1” 1”– 6” 9” 12” Mantel Projection A (25 mm) (25–152 mm) (229 mm) (305 mm) 36” 39” 42” 45” Mantel Height B* (914 mm) (991 mm) (1067 mm) (1143 mm) 8¾ to 10¾ ‘A’ ‘A’...
  • Page 3: Maintenance

    Maintenance  WARNING DO NOT TOUCH THE BARRIER SCREEN, THE FRONT or THE GLASS WHILE THEY ARE HOT! Let the fireplace cool first before maintenance. FOR SAFETY PURPOSE, ensure the barrier screen is re-installed on the fireplace front after maintenance. To clean the front and trim, use mild soap and water. You can dust the screen with a soft brush.
  • Page 4: Guide D'installation

    GUIDE D’INSTALLATION Série G3 Devanture en acier 741SFB Approuvées pour usage avec les foyers Valor 738, 739 et les foyers RF24B dans la Caisse à dégagement zéro RA24ZC SEULEMENT DANGER INSTALLATEUR : Laissez cette notice avec l’appareil. CONSOMMATEUR : Conservez...
  • Page 5 738/739 et RA24ZC Dégagements manteau ou tablette 1” 1”– 6” 9” 12” Projection du manteau ‘A’ (25 mm) (25–152 mm) (229 mm) (305 mm) Hauteur du 36” 39” 42” 45” manteau ‘B’ (914 mm) (991 mm) (1067 mm) (1143 mm) ‘A’...
  • Page 6: Entretien

    Entretien  AVERTISSEMENT NE TOUCHEZ PAS LE PARE-ÉTINCELLES OU LE FOYER LORSQU’ILS SONT CHAUDS! Laissez le foyer refroidir avant l’entretien. POUR DES RAISONS DE SÉCURITÉ, assurez- vous que le pare-étincelles soit réinstallé sur la devanture après l’entretien. Pour nettoyer la devanture et la bordure, utilisez une solution d’eau et de savon doux.

This manual is also suitable for:

741sfb