Download Print this page
FRAME IT ALL Fort Bragg 8' x 8' Assembly Instructions

FRAME IT ALL Fort Bragg 8' x 8' Assembly Instructions

Raised garden bed

Advertisement

Quick Links

800001121, 800001122, 800001123, 800001124
800002121, 800002122, 800002123, 800002124
800003121, 800003122, 800003123, 800003124
800004121, 800004122, 800004123, 800004124
1 LEVEL1
1 LEVEL KIT CONTAINS:
Composite Boards 4' x 8
Composite Boards 2' x 4
Stacking Brackets x 24
Stacking Stakes x 12
Plugs x 48
Caps x 12
Recommended Tools:
-
Hammer
-
Flathead Screwdriver
loops with the stake pointing to the sky. This enables you to freely
Trim stake spike with
hacksawfor use indoor
or on hard surfaces
Customer Service: 1800-914-9835 |
support@frameitall.com
© Frame It All. All Rights Reserved.
RAISED GARDEN BED
8' x 8' Fort Bragg
2 LEVELS
2 LEVEL KIT CONTAINS:
Composite Boards 4' x 18
Composite Boards 2' x 10
Stacking Brackets x 36
4-way Bracing Brackets x 16
Stacking Stakes x 24
Plugs x 120
Caps x 12
Layout your Boards along the borderline and connect each Board
together by inserting the top of the stake through the bracket
position your border to get your desired location.
FOR INDOOR & HARD SURFACE:
If you plan to assemble raised bed on a hard surface, use
hacksaw to remove the spike of each stake. Use these cut
down stakes for the base level only of your raised garden.
3 LEVEL KIT CONTAINS:
Composite Boards 4' x 26
Composite Boards 2' x 14
Stacking Brackets x 36
4-way Bracing Brackets x 16
Stacking Stakes x 36
Plugs x 160
Caps x 12
ASSEMBLY INSTRUCTIONS – Level 1
STEP 1:
Assemble the Boards by sliding one end of Board into channel end
of one of the brackets. Use plugs to cover the holes on both sides to
lock the bracket in place.
8
1. Connect
x 4ft Boards with Stacking Brackets on
both ends in alternating orientation.
4
2. Connect
x 2ft Boards in the same pattern
How the Joints Work
Use a Cap to
complete the
top level.
Use stacking
stakes for
ground level
frames and
Use plugs to
Use plugs (included)
stacking
cover the holes
additional levels.
– two plugs are
to cover the holes on
required per
both side of Boards
bracket (1 on
each side)
4 LEVEL KIT CONTAINS:
Composite Boards 4' x 36
Composite Boards 2' x 20
Stacking Brackets x 80
4-way Bracing Brackets x 32
Stacking Stakes x 48
Plugs x 224
Caps x 12
1
2
3-Way Connection:
Combine a top 4-way
bracket, mid-section 4-
way bracket and
Use stacking
Stacking stake fit
stake when
into the tops other
stacking bracket.
creating a
Stacking stakes
multi-level

Advertisement

loading
Need help?

Need help?

Do you have a question about the Fort Bragg 8' x 8' and is the answer not in the manual?

Questions and answers

Summary of Contents for FRAME IT ALL Fort Bragg 8' x 8'

  • Page 1 Customer Service: 1800-914-9835 | Use plugs (included) stacking cover the holes additional levels. – two plugs are to cover the holes on support@frameitall.com required per both side of Boards © Frame It All. All Rights Reserved. bracket (1 on each side)
  • Page 2 ASSEMBLY INSTRUCTIONS – Level 1 Continued Step 3: When connecting the boards for the first level, insert the stacking stakes upside down so the stake is pointing to the sky. This will allow you to Step 2: Layout the Boards for the first level according to the number of the adjust the shape of your frame before driving the stakes into the ground.
  • Page 3 ASSEMBLY INSTRUCTIONS – Level 2 Step 6: Layout the boards the second level of your design on the ground STEP 5: around your base frame. Once they are all laid out, begin stacking and Connect the brackets and boards for the second level in the following pattern: connecting them starting at a corner and working your way out.

This manual is also suitable for:

800001121800001122800001123800001124800002121800002122 ... Show all