Modulex EXT Series Piping
CSD-1 MANIFOLD ASSEMBLY (SUPPLIED)
SECTION 4: CSD-1 MANIFOLD ASSEMBLY (SUPPLIED)
The installation of a flow switch, pressure/temperature gauge, and an ASME compliant safety pressure
relief valve designed for the boiler output capacity is required. These major components are supplied with
the boiler and must be assembled and wired when installing the boiler at the site. The manifold assembly
components supplied are:
• Pressure Relief Valve (3/4" for EXT 450 2S – 1100 2S, 1-1/2" for EXT 1500 2S – 3000 2S)
• Flow Switch
• Pressure/Temperature Gauge
NOTE: Units ship with an 80 psi relief valve. For higher or lower system pressure, a different rated relief
valve must be field supplied.
Full instructions for installing these components are included in the Modulex EXT Installation, Operation &
Maintenance Guides.