Gas Feeding; 5.11.1 Gas Feeding Line - Riello RS 1300/EV C01 Modulating Operation

Forced draught gas burners
Table of Contents

Advertisement

5.11

Gas feeding

Explosion danger due to fuel leaks in the pres-
ence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure the fuel interception tap is closed be-
fore performing any operation on the burner.
The fuel supply line must be installed by qualified
personnel, in compliance with current standards
and laws.
WARNING

5.11.1 Gas feeding line

Key (Fig. 18 - Fig. 19 - Fig. 20 - Fig. 21)
1
Gas input pipe
2
Manual valve
3
Vibration damping joint
4
Pressure gauge with push-button cock
5
Filter
6A Includes:
– filter
– working valve
– safety valve
– pressure adjuster
6B Includes:
– working valve
– safety valve
– pressure adjuster
6C Includes:
– safety valve
– working valve
6D Includes:
– safety valve
– working valve
7
Minimum gas pressure switch
8
Leak detection control, provided as an accessory or integrat-
ed, based on the gas train code. In compliance with the EN
676 standard, the leak detection control is compulsory for
burners with maximum outputs over 1200 kW.
9
Gasket, for "flanged" versions only
10 Pressure adjuster
11 Train-Burner adaptor, supplied separately
P2 Upstream pressure of valves/adjuster
P3 Upstream pressure of the filter
L
Gas train, supplied separately
L1 The responsibility of the installer
Installation
MBC "threaded"
20062223
MBC "flanged" - VGD
20062225
DMV "flanged or threaded"
20062227
CB "flanged or threaded"
20062228
21
GB
Fig. 18
Fig. 19
Fig. 20
Fig. 21
20089633

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs 1600/ev c01Rs 2000/ev c01200811902008087120070919

Table of Contents