Mounting; Monitor Unit/Control Unit; General Mounting Considerations; Mounting Unibody Type - Furuno CH-300 Installation Manual

Dual-frequency searchlight sonar
Hide thumbs Also See for CH-300:
Table of Contents

Advertisement

MOUNTING

1.
1.1

Monitor Unit/Control Unit

This searchlight sonar has two types of shipments, unibody type which is
shipped with monitor unit, and blackbox type which is shipped without a monitor
unit, but has an interface unit. For blackbox type, see page 1-5.
The control unit can be installed together with the monitor unit, or independently
of the monitor unit. For separate installation, the optional monitor kit is required.
These units can be installed on a tabletop or flush mounted in a console or
panel.
1.1.1

General mounting considerations

• Keep the monitor unit out of direct sunlight.
• Select a location where the unit(s) can easily be operated while observing the
fishing ground or area surrounding the vessel.
• For maintenance and checking purposes, leave sufficient space at the sides
and rear of the unit and leave slack in cable. (Refer to the outline drawing at
the back of this manual.)
1.1.2

Mounting Unibody type

1. Fasten the mounting base to the mounting location with four self-tapping
screws (5X20).
2. Fasten the bracket at the rear of monitor/control unit with four binding screws
(M4x10).
NOTICE
Do not apply paint, anti-corrosive sealant
or contact spray to coating or plastic
parts of the equipment.
Those items contain organic solvents that
can damage coating and plastic parts,
especially plastic connectors.
FRONT
Mounting base
1-1

Advertisement

Table of Contents
loading

Table of Contents