Commissioning | 5
Enter the PROFIBUS-DP slave address.
After confirming with OK, a DP slave with three empty slots is displayed.
The slots of the DP slave are filled by clicking on the desired module configuration.
The created hardware project planning must now be transferred to the controller.
After the transfer to the CPU, the bus operation starts immediately if the slave is connected
correctly, and the red LEDs "BF" at the slave and at the S7-CPU go out.
5.6
The specified PROFIBUS-DP slave address must be set using the rotary switches
of the podis MOT. Next, switch the supply voltage of the module off and on again to
activate the specified bus address.
NOTICE
Wieland Electric | BA000349 | 05.2007