Wieland podis MOT FP C Operation Manual page 26

Table of Contents

Advertisement

Electrical Installation | 4
The electrical connection on the energy bus flat cable is carried out by screwing in the pen-
etrating screws.
It is recommended to use a cordless driver with adjustable torque.
The following notices must be observed when handling penetrating screws:
All penetrating screws must be screwed in to the stop.
Use a pneumatic or electrical screwdriver.
Use Phillips no.1 screwdriver blades with a shaft length of at least 45 mm.
Maximum torque 1 Nm.
Screwed in penetrating screws must not be unscrewed again. When removing a po-
dis field distributor from the flat cable, use the podis sealing sleeve (Z1.005.6553.1)
to seal the contact positions.
Only original screws from Wieland Electric may be used.
Operation with torn off screws is not allowed.
Cable ties must not be removed, and the cover of the penetrating screws (connec-
ting plate) must be reinserted after complete installation.
4.
CAUTION
Wieland Electric | BA000349 | 05.2007

Advertisement

Table of Contents
loading

This manual is also suitable for:

Podis mot fp cmPodis mot fp cp

Table of Contents