Download Print this page

Midland 70-066 Manual page 38

Conversion to 6 meters
Hide thumbs Also See for 70-066:

Advertisement

INITIAL TRANSCEIVER REMOVAL of COVERS:
 Remove four screws from each side of the transceiver, then remove the top and bottom covers.
 With a black felt marker pen – Write your call-sign on each cover and inside the top and bottom of
the transceiver chassis.
 Then – Modify the Z-273 EPROM PCB [part 1], the synthesizer [part 1], the receiver [part 2], and
the transmitter PA [part 4].
CCARC TEST CABLE's to be BUILT:
 RF cable Transceiver to Power Meter.
 RF cable Transceiver to Signal Generator. RG58 – BNC to UHF connectors.
 DC cable for receiver testing. 2 pin connector to 2 of red banana plugs [for DC meter].
 DC cable for synthesizer testing. 1 cable - black banana plug to alligator clip.
 UV Light assembly for bulk erasing of Z-273's 2716 EPROM's.
Midland 70-066 low Band Conversion to 6 Meters: Synthesizer Part 2
RG58 – Type N to UHF connectors.
1 cable - red banana plug to red clip.
Page 2.2

Advertisement

loading