Inground uplights with installation blockout (10 pages)
Summary of Contents for WE-EF PFL230
Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions for Post Mounted Luminaire PFL230 LED INSTALLER HOTLINE +61 458 933 399 7am – 7pm AEST...
Page 3
Post Mounted Luminaire Lamps 12 LED 12W / 18 LED 18W / 12 LED 24W / 18 LED 36W* * Nominal power, for latest data refer to www.we-ef.com Ø 5,5 - 12 mm Protection: IP66 / IK08 Class I, II, ta = 25°C Mounting height: .
Page 4
Installation Procedure 1) Switch off the mains electrical supply. Notice: In case the luminaire is equipped with an optional available surge protector, the function can get tested if the 2) Loosen screws B and open frame A. signal LED is lit green when the supply voltage is turned on. Unlock shutter C and turn down the gear-tray, discon- In case the surge protector is defective, the LED device nect plug connector D and remove the gear-tray.
ATTENTION ! Technical Data - Installation must be performed only by electrically skilled operator. 2000 m max. 6500 ft max. - National electrical installation rules must be followed. - The unit must be used only as surge protector and -40/+85°C max. according the conditions described in this document.
Application example Installation 0.5-2.5mm² Switchboard #20-13 AWG 10 mm 10 mm 0.4 in 0.4 in DS98L Clip on symmetrical DIN rail 0.5 Nm 4.4 Lb-In optional #20-13 AWG 0.5-2.5mm² Attention Maintenance If the Luminaire is supplied with a Citel Green LED ON + AC ON = OK MLPC-230L-V, please refer to the instructions supplied with the device Green LED OFF + AC line OFF = Defect...
Need help?
Do you have a question about the PFL230 and is the answer not in the manual?
Questions and answers