Cable Fabrication; Wiring - Furuno IF-2550 Installation Manual

Table of Contents

Advertisement

6. CABLE FABRICATION

Use the TTYCSLA-1, TTYCSLA-4 (Japan Industrial Standard cables) or the
.
equivalents
Armor

7. WIRING

The procedure of the wiring is as follows;
1. Unfasten the four screws, then remove the cover.
NOTE: The connector sheet and hook spanner (239-332) are attached to the back of the cov-
er. Take care not to lose them.
40 40
Inner sheath
Pass the Insulation Tube (supplied) onto the
drain wire.
Vinyl tape
Back of the cover
6
190 TB1/TB4
190 TB1/TB4
160 TB2/TB3
160 TB2/TB3
150 TB1/TB4
150 TB1/TB4
120 TB2/TB3
120 TB2/TB3
Attach the crimp-on lug to the core.*
*: For IF-2550-IEC2 only.
Connector
Sheet
Hook Spanner
236-332
Drain wire
Drain wire
3
3