Signalling Diagram - Volvo EC15E Operator's Manual

Table of Contents

Advertisement

Operating techniques
132

Signalling diagram

Manual signalling to an operator of a mobile excavator as per SAE J1307.
The primary use of hand signals is for a signalman to direct the lifting, handling, and
placement of loads attached to working equipment. Hand signal usage may also be
applicable to earth moving operations and/or machine travel when the operator's visibility
is obstructed.
If a rapid lifting, lowering or moving movement is required, the dipper arm movements
should be carried out more lively. If two different machines are used for lifting the same
load, there should be an agreement beforehand how the lift should be carried out and
what signals should be given to the respective operators.
V1065920
RAISE LOAD VERTICALLY
With either forearm vertical,
forefinger pointing up, move
hand in small horizontal
circles.
V1065924
MOVE LOAD OUT
HORIZONTALLY
With either arm extended,
hand raised and open
toward direction of
movement, move hand in
direction of required
movement.
V1065927
Signalling diagram
V1065921
LOWER LOAD
VERTICALLY
With either arm extended
downward, forefinger
pointing down, move hand in
small horizontal circles.
V1065925
RAISE BOOM
With either arm extended
horizontally, fingers closed,
point thumb upward.
V1065928
V1065923
MOVE LOAD IN
HORIZONTALLY
With either arm extended,
hand raised and open
toward direction of
movement, move hand in
direction of required
movement.
V1065926
LOWER BOOM
With either arm extended
horizontally, fingers closed,
point thumb downward.
V1065929

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec18eEcr18eEc20e

Table of Contents