Exmark Quest 126-7510 Manual page 14

50 inch bagger
Table of Contents

Advertisement

Figure 21
1. Bagger top
2. Bagger frame
3. Key hole
3. Lift the bagger top and install the bags by sliding
the bag frame hooks onto the retaining brackets.
g032709
4. Bracket, bagger top
5. Key
6. Post
4
3
g028327
1. Bag
2. Bagger frame
4. Lower the bagger top onto the bag.
5. Install the upper bagger tube. Insert the curved
end into the opening in the bagger top. Make
sure the flared end with the retention post is
pointing down and forward in preparation to be
mated with the Finishing Kit.
6. Align the hole in the rubber hood latch with the
hood rod.
14
1
2
Figure 22
3. Retaining bracket
4. Bag frame hook
Figure 23
g028327
g207349

Advertisement

Table of Contents
loading

Table of Contents