Step 2 Framing The Fireplace - Heat-N-Glo CFX-DA Installer's Manual

Table of Contents

Advertisement

Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
Shows center of 12" x 12" vent
framing hole for top venting.
A. ......... 39 3/4"
B. ............... 39"
C. ......... 20 1/4"
D. ......... 43 1/2"
Framing should be
constructed of 2 X 4
lumber or heavier.
Figure 3.
Framing Dimensions
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
43.750 (REF)
D
B
A
10
C

Advertisement

Table of Contents
loading

Table of Contents