Step 2 Framing The Fireplace - Heat-N-Glo SL-750TRS-C Installer's Manual

Table of Contents

Advertisement

Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
Framing should be
constructed of 2 X 4
lumber or heavier.
The framing headers
may rest on the
fireplace stand-offs.
Model
SL-750TRS-C
SL-550TRS-C
SL-350TRS-C
*The center of the framing hole is one (1) inch (25.4mm)
above the center of the horizontal vent pipe.
Figure 5.
Framing Dimensions
VENT
FRAMING
HOLE
A
B
C
D
42"
38 1/4"
16 1/4"
41"
37"
33"
16 1/4"
36 1/2" 24 3/8"
34"
31"
16 1/4"
35 1/2" 22 3/8"
WARNING:
To ensure proper clearances the
front framing header must be installed
on its narrow edge and to the front of
the frame.
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
E *
27 7/8"
B
A
16
D
E
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-350trs-cSl-550trs-c

Table of Contents