Step 2 Framing The Fireplace - Heat-N-Glo HV-CDN Installer's Manual

Table of Contents

Advertisement

Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
Framing should be constructed of 2 X 4
lumber or heavier. The framing headers may
rest on the fireplace stand-offs.
VENT
FRAMING
HOLE
Note: The center of the
vent framing hole is 1
inch (25mm) above the
center of the horizontal
vent pipe.
WARNING: To ensure proper clearances the front
framing header must be installed on its narrow edge
and to the front of the frame.
45
0
Elbow (Horizontal) 34"
45
0
Elbow (Vertical)
Figure 3.
Framing Dimensions
A
B
C
D
35 1/2" 15 1/2" 28 1/4"
34"
33"
17 1/2"
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
D
B
A
-
10
C

Advertisement

Table of Contents
loading

Table of Contents