Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
Framing should be constructed of 2 X 4
lumber or heavier. The framing headers may
rest on the fireplace stand-offs.
VENT
FRAMING
HOLE
Note: The center of the
vent framing hole is 1
inch (25mm) above the
center of the horizontal
vent pipe.
WARNING: To ensure proper clearances the front
framing header must be installed on its narrow edge
and to the front of the frame.
45
0
Elbow (Horizontal) 34"
45
0
Elbow (Vertical)
Figure 3.
Framing Dimensions
A
B
C
D
35 1/2" 15 1/2" 28 1/4"
34"
33"
17 1/2"
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
D
B
A
-
10
C