8-2
Switch/ Controller section
11
1
Switch
2
Switch unit (for detecting unlock-off)
3
Battery fuel gauge
4
Noise suppressor
9
Assemble Flag receptacle to Switch so that Lead wires come out in the direction shown in figure.
10
Be careful not to put Lead wires on this Rib.
11
Fix Lead wires of Switch unit (for detecting lock off) in this Lead wire holder.
12
Route Lead wires of Switch unit (for detecting lock off) between this Rib and the inner wall of Housing.
Fix Lead wires of Switch unit (for detecting lock off), Lead wire of Battery fuel gauge and Lead wires of Noise suppressor in this
13
groove.
14
Put Lead wires under Fin of Controller between Rib A and Controller.
Fig. 52
1
2
5
13
8
26 / 32
9
10
12
5
Inner wall of Housing
6
Rib A
7
Fin of Controller
8
Controller
13
3
4
6
14
7