Skill Level – Installation requires basic mechanical skills. Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the GE Appliance Warranty. GROUNDING THE FRESH-FOOD REFRIGERATOR OR BAR REFRIGERATOR WITH ICEMAKER IMPORTANT –...
The water pressure must be between 20 and 120 p.s.i. • The water line can enter the opening through the floor or back wall. Route 1/4" O.D. copper tubing or GE SmartConnect ™ kit between the cold water line and water connection location, long enough to extend to the front of the refrigerator.
Recess the filler strip 1-5/8" back from the front face of the refrigerator, or even with the front edge of the product case (behind the gasket). The width of the opening must be 24" (including the 1/4"...
For a complete refreshment center, install a Fresh-Food Refrigerator beside a Double-Drawer Refrigerator, Beverage Center or Wine Chiller/Wine Reserve. Or, install a Refrigerator with Icemaker beside a Wine Chiller/Wine Reserve. • A side-by-side installation requires at least a 47-1/2"- wide minimum opening for standard installation and 48"-wide minimum opening for flush installation.
For models ZIFI240 and ZIBI240 with Custom Door Panels and Handles THE INSTALLATION SPACE NOTE: If installing between frameless cabinets, a 1/2" wide filler strip or side panel may be needed on the hinge side. The filler strip will act as a spacer between the door case and adjacent cabinet and will prevent interference...
For a complete refreshment center, install a Fresh-Food Refrigerator beside a Double-Drawer Refrigerator, Beverage Center or Wine Chiller/Wine Reserve. Or, install a Refrigerator with Icemaker beside a Wine Chiller/Wine Reserve. • A side-by-side installation requires at least a 47-1/2"- wide opening. No trim kits required.
Installation Instructions STEP 1 REMOVE PACKAGING AND INSTALLATION PARTS • Remove corner blocks and foam drawer stops. • Remove all packing material, tape and protective plastic coverings. • Remove the toekick attached to the back of the unit. • Remove the custom panel attached to the front of the unit.
Copper Tubing: • Slip a 1/4" nut and ferrule over both ends of the copper tubing. Insert the tube into the refrigerator connection on the unit and tighten the nut. • Turn on the water to check for leaks.
• Check to make sure power is on by opening the door to see if interior light turns on. • Bar Refrigerator with Icemaker – The interior fan runs all the time except during defrost cycle when the door is open.
Page 12
Pub. No. 31-51544-6 Part No. 197D5893P002 09-09 JR Printed in Slovenia NOTE: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram ® local service in your area, call 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric.
Need help?
Do you have a question about the Monogram ZIBI240PII and is the answer not in the manual?
Questions and answers