LUNA2000-(5-30)-S0
User Manual
Type
Personal protective
equipment (PPE)
4.3 Determining the Installation Position
Installation Angle Requirement
The battery can be floor-mounted and wall-mounted. The installation angle
requirement is as follows:
●
Installation Space Requirements
●
Issue 07 (2022-01-10)
Tools and Instruments
Hydraulic pliers
Safety gloves
Safety boots
Do not install the battery at forward tilted, back tilted, side tilted, horizontal,
or upside down positions.
Reserve sufficient clearance around the battery to ensure sufficient space for
installation and heat dissipation.
Copyright © Huawei Technologies Co., Ltd.
Heat-shrink tubing
Safety goggles
-
4 System Installation
Heat gun
Dust mask
-
53